Case study
Semi-conductor
  case1
  case2
  case3
  case4
  case5
  case6
  case7
  case8
 
Electronic
 
Transportation
 
Building Automation
 
Public Engineering
 
Chemical
 
OPC Gateway
 
Others
 

 

 

 

 

 


Central Monitoring in IT Factory

Project Introduction:

There are lots of production lines in the clean rooms of IT factory. Through OPC Server, Cell Process Engineer could easily handle producing problems in the central monitoring space. Besides, for MIS department, data collection could become piece of cake. Through OPC Client, engineer could obtain all the statistics, operating trend and historical data in Access Database format.

 

System Requirement:

Advantech Studio (SCADA)

Mitsubishi Serial OPC Server
Fatek Serial OPC Server

MDC360 Serial OPC Serial

Windows Server 2003 R2

 

System Diagram:

Conclusions:

The performance of SCADA is limited. Therefore, integrating all the available recourses would be a key point for successful business. The case above shows an excellent template for integrating OPC Server, SCADA and MIS together to conquer challenges. This is what OPCTechs do! We provide precise software integration solutions for our customers.