County Government Building Automation Project

Project Introduction:

In the county government building, we need to integrate the power meters、two way light controller、fan system and fire alarm system. We got to collect all of the data into the SCADA. The system could not only monitor the signals but also control the equipments in the fields. People could use IE Browser to monitor all of the status or values of the equipments. From the figures of the SCADA, the operators could be informed to manage the alarm signals. It could also be informed someone by email or phone call.

 

System Requirement:

1 set SCADA

Panasonic two-way light controller OPC SERVER

DI/O controller

1 set industry PC

 

System Diagram:

Conclusions:

In this case, we met the Panasonic two way light controller with specific protocol. There is not any SCADA or Driver could connect with this devices. This is why our customer wanted OPCTechs Corp. to help them integrate the system for them.